84rzv500r
Jetboaters Captain
- Messages
- 1,128
- Reaction score
- 1,891
- Points
- 222
- Location
- Lower Keys MM29
- Boat Make
- Yamaha
- Year
- 2004
- Boat Model
- AR
- Boat Length
- 20
ok the second one took way less time as all the tools and jigs were already to go... just need top off the bearing housings with some 80w-90 and install... it will take the better part of a day as I want to replace the impeller shaft hoses and the Mid bearings whist I have it all apart...
it will take longer to pick up the tools
![attachment - 2022-11-05T151301.428.jpg](https://jetboaters.nyc3.digitaloceanspaces.com/data/attachments/190/190728-a7e841b99ff83ade6d2e537797ecd74b.jpg)
it will take longer to pick up the tools
![attachment - 2022-11-05T151301.428.jpg](https://jetboaters.nyc3.digitaloceanspaces.com/data/attachments/190/190728-a7e841b99ff83ade6d2e537797ecd74b.jpg)