Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Welcome to Jetboaters.net!
We are delighted you have found your way to the best Jet Boaters Forum on the internet! Please consider Signing Up so that you can enjoy all the features and offers on the forum. We have members with boats from all the major manufacturers including Yamaha, Seadoo, Scarab and Chaparral. We don't email you SPAM, and the site is totally non-commercial. So what's to lose? IT IS FREE!
Membership allows you to ask questions (no matter how mundane), meet up with other jet boaters, see full images (not just thumbnails), browse the member map and qualifies you for members only discounts offered by vendors who run specials for our members only! (It also gets rid of this banner!)
The Heeler is a fan of "Alone" on history Chanel like her pops. Problem is she doesn't understand "DOWN IN FRONT" and I miss a lot of the show, especially when they are pulling fish out of the lake.
A lot of rain all around us, but we are high and dry. It seemed like the heavy stuff went around us on East and West, sparing us the flooding as we open tomorrow for the 2023 season.
A lot of rain all around us, but we are high and dry. It seemed like the heavy stuff went around us on East and West, sparing us the flooding as we open tomorrow for the 2023 season.
Its not a kit, and its 35x61
The building and the concrete, not including the 90 foot driveway was 50k.
Includes 2 insulated 36inch doors and 6 insulated windows.
The custom black overhead 12x12 door is from a local overhead door company also not included in the 50k
Its not a kit, and its 35x61
The building and the concrete, not including the 90 foot driveway was 50k.
Includes 2 insulated 36inch doors and 6 insulated windows.
The custom black overhead 12x12 door is from a local overhead door company also not included in the 50k
Its not a kit, and its 35x61
The building and the concrete, not including the 90 foot driveway was 50k.
Includes 2 insulated 36inch doors and 6 insulated windows.
The custom black overhead 12x12 door is from a local overhead door company also not included in the 50k
Envious for me, and stoked for you! $50K seems like a pretty good deal for the concrete and the structure! Did you run water and power into it as well? Bathroom / shower?
Envious for me, and stoked for you! $50K seems like a pretty good deal for the concrete and the structure! Did you run water and power into it as well? Bathroom / shower?
My electrician friend is putting a stand alone service on it. It will need multiple 220 systems for lift, compressor, welder, etc so dont want to add to my home.
No sewer or septic but will have water to building already have meter box installed just have to run the 1 inch main line from meter to building in the future
Envious for me, and stoked for you! $50K seems like a pretty good deal for the concrete and the structure! Did you run water and power into it as well? Bathroom / shower?
My electrician friend is putting a stand alone service on it. It will need multiple 220 systems for lift, compressor, welder, etc so dont want to add to my home.
No sewer or septic but will have water to building already have meter box installed just have to run the 1 inch main line from meter to building in the future
A solid plan for the electric! Should keep the lights in the house from blinking every time you strike an arc. And hey, maybe one day even some AC for the hot sticky NC afternoons? I’d love a building like that to shelter my boat and RVs from the hail threat here… hopefully one day soon. Unfortunately, while the value of my property went from $340 to $570 the interest rates went from 3% to 7%..not willing to give up my 3% mortgage for a 7% mortgage on one with $50K added to it. Looks great Neutron!
A solid plan for the electric! Should keep the lights in the house from blinking every time you strike an arc. And hey, maybe one day even some AC for the hot sticky NC afternoons?
A/C will definitely be going in but not till next year. Still have lots to to before i am working in there. Will be just storage for the next 6 months or so.
After the electricians are done i have a company coming in to epoxy the floors. Gonna look like dark blue and black granite. They give a lifetime warranty with their work.
After that its back to saving and hold on spending for a bit
A/C will definitely be going in but not till next year. Still have lots to to before i am working in there. Will be just storage for the next 6 months or so.
After the electricians are done i have a company coming in to epoxy the floors. Gonna look like dark blue and black granite. They give a lifetime warranty with their work.
After that its back to saving and hold on spending for a bit
A/C will definitely be going in but not till next year. Still have lots to to before i am working in there. Will be just storage for the next 6 months or so.
After the electricians are done i have a company coming in to epoxy the floors. Gonna look like dark blue and black granite. They give a lifetime warranty with their work.
After that its back to saving and hold on spending for a bit